Trash chute from entry-level floor to ground levelWork has begun on HSLIC’s entry-level (2nd floor) renovation project!

The construction crew has set up a trash chute to a dumpster next to the building’s loading dock. They also have begun installing barrier walls around the portion of the 2nd floor they are working on first. The crew also began demolition in the computer classroom. Temporary barrier walls on library entry-level floor

Ceiling of computer classroom during demolitionThe goal of this project is to provide a more useable space, including:

- A kitchenette with refrigerator, microwave, and sink for student use

- Updated study spaces and student computer lab

- New library service desk with additional storage for large items students like to check out, such as sporting goods

- Additional technology space for virtual reality, 3D printing, virtual anatomy table, and more

- Flexible space for easy reconfiguration 

For more information about the renovation and to view conceptual drawings, visit our online information guide!