December 2023-January 2024: preliminary preparation, move entry level furniture
February-November: primary construction with demolition and installation of carpet, tile, the new service desk, and kitchenette.
As of April 2024, the construction crew has:
Follow the library's blog for updates and photos! (type "renovation" in the blog search bar)
The entry level renovation is funded as part of the 2024 capital outlay from the State of New Mexico.
On each page of the guide, use the arrows to scroll through the design renderings.
The middle (3rd floor) and top floor (4th floor) of the library will remain open. Study rooms and library services will be available. Construction will typically take place from 8am-5pm Monday through Friday, so here are some tips for seeking out quiet study options: